Appendix 2.4.1
Basic documents identified for the preparation of the survey
à Manual of protocols, including all the addenda
à Detailed sampling
gear plan
à Video cassette on
« Efficiency of the Medits
gear »
à References of the
temperature sensor
à Previous Medits reports
Main technical milestones..................................................... Period/Deadline
Nomination of a co-ordinator............................................................. 15/12/1998
Transmission of basic information.................................... End
of December 1998
Ordering of the equipment..................................................................... 01/1999
Availability of the equipment.................................................. End
of March 1999
Test survey.................................................................... Beginning
of April 1999
Full survey......................................................... about
15 days during May-June
Reminder: Agenda of the Medits programme for 1999
The following milestones have been identified
for the activity of the Medits
group in 1999.
Topic Date
/ Period
· Interim report....................................................................................................... End
of 1998
· Annual report...................................................................................................... January
1999
· Proposal for the next FCP call of proposals............................................................ Spring
1999
· Working group on multiannual data analysis,
Italy.................................................. Early
spring 1999
· SC meeting,........................................................................................................ Spring 1999
· Medits ‘99 survey.............................................................................................. May-July
1999
· Basic data (checked and validated) (SCM>GC)...................................................... 30/09/1999
· General meeting, Nantes (period reserved)............................................................. November
1999
· Final report......................................................................................................... End
of 1999
SC: Steering committee; SCM: Steering committee
member; GC: General co-ordinator
___
Participants MEDITS
meetings in Morocco, 1 and 2 December 1998
[1] Ministère des pêches (Rabat), 1 December 1998
[2] INRH (Casablanca), 2 December 1998
Name |
Organization |
Observation |
[1] |
[2] |
ABDELAZIZ
Zioubi |
INRH, Biostatistiques, Maroc |
|
|
|
ABDELLAH S. |
INRH, Maroc |
|
|
|
ABOUELOUAFA |
DRH, Maroc |
|
X |
|
BERTRAND Jacques |
MEDITS, (IFREMER) France (coordinateur) |
|
|
X |
ELOUAIRI Mehdi |
INRH,URD, Ressources démersales, Maroc |
|
X |
X |
FARAJ Abdelmalek |
INRH, Ressources halieutiques, Maroc |
|
|
X |
GIL DE SOLA Luis |
MEDITS, (IEO) Espagne |
|
X |
X |
IDELHAJ Abdelouahad |
INRH, Département halieutique, Maroc |
idelhaj@inrh.org.ma |
|
X |
JANATI A. |
DPMA,Maroc |
|
X |
|
LAHNIN Abdelhak |
INRH, Technologie des pêches, Maroc |
lahnin@inrh.org.ma |
|
X |
MARFOUK Abdeslem |
INRH, Service gestion des navires, Maroc |
|
|
X |
MESKI |
Coopération, Maroc |
|
X |
|
MOUSSALI |
Chambre Maritime de la Méditerannée, Maroc |
|
X |
|
OUATI |
Coopération, Maroc |
|
X |
|
ROBLES Rafael |
Fao-Copemed |
|
X |
X |
SEDRATI |
INRH, Maroc |
|
X |
|
SROUR Abdellah |
INRH, Nador, Maroc |
|
X |
X |
SOUPLET Arnaud |
MEDITS, (IFREMER) France |
|
X |
X |
SRAIRI Ali |
INRH, Evaluation directe, Maroc |
Medits Co-ordinator for Morroco elouairi@inrh.org.ma |
|
X |
ZOUBI Abdelaziz |
INRH, Biostatistiques, Maroc |
|
|
X |
___
[1] During these meetings, only
technical and scientific items have been considered. It was anticipated that
other aspects (particularly the financial ones) will be studied through
Moroccan officials and Fao-Copemed relationships.
[2] As soon as the participation of the
Moroccan team will be formally agreed by the Medits
co-ordination committee, an access to the restricted area will be given to this
team. By this way, this team will be able to catch the common software in use
within the programme.