Appendix 2.4.1

 

Basic documents identified for the preparation of the survey

à  Manual of protocols, including all the addenda

à  Detailed sampling gear plan

à  Video cassette on « Efficiency of the Medits gear »

à  References of the temperature sensor

à  Previous Medits reports

           

Main technical milestones..................................................... Period/Deadline

Nomination of a co-ordinator............................................................. 15/12/1998

Transmission of basic information.................................... End of December 1998

Ordering of the equipment..................................................................... 01/1999

Availability of the equipment.................................................. End of March 1999

Test survey.................................................................... Beginning of April 1999

Full survey......................................................... about 15 days during May-June

 

 

Reminder: Agenda of the Medits programme for 1999

The following milestones have been identified for the activity of the Medits group in 1999.

Topic                                                                                                                                                             Date / Period

·   Interim report....................................................................................................... End of 1998

·   Annual report...................................................................................................... January 1999

·   Proposal for the next FCP call of proposals............................................................ Spring 1999

·   Working group on multiannual data analysis, Italy.................................................. Early spring 1999

·   SC meeting,........................................................................................................ Spring 1999

·   Medits ‘99 survey.............................................................................................. May-July 1999

·   Basic data (checked and validated) (SCM>GC)...................................................... 30/09/1999

·   General meeting, Nantes (period reserved)............................................................. November 1999

·   Final report......................................................................................................... End of 1999

SC: Steering committee; SCM: Steering committee member; GC: General co-ordinator

___

 

 

Participants MEDITS meetings in Morocco, 1 and 2 December 1998

[1] Ministère des pêches (Rabat), 1 December 1998

[2] INRH (Casablanca), 2 December 1998

 

Name

Organization

Observation

[1]

[2]

ABDELAZIZ  Zioubi

INRH, Biostatistiques, Maroc

 

 

 

ABDELLAH S.

INRH, Maroc

 

 

 

ABOUELOUAFA

DRH, Maroc

 

X

 

BERTRAND Jacques

MEDITS, (IFREMER) France (coordinateur)

 

 

X

ELOUAIRI Mehdi

INRH,URD, Ressources démersales, Maroc

 

X

X

FARAJ Abdelmalek

INRH, Ressources halieutiques, Maroc

 

 

X

GIL DE SOLA Luis

MEDITS, (IEO) Espagne

 

X

X

IDELHAJ Abdelouahad

INRH, Département halieutique, Maroc

idelhaj@inrh.org.ma

 

X

JANATI A.

DPMA,Maroc

 

X

 

LAHNIN Abdelhak

INRH, Technologie des pêches, Maroc

lahnin@inrh.org.ma

 

X

MARFOUK Abdeslem

INRH, Service gestion des navires, Maroc

 

 

X

MESKI

Coopération, Maroc

 

X

 

MOUSSALI

Chambre Maritime de la Méditerannée, Maroc

 

X

 

OUATI

Coopération, Maroc

 

X

 

ROBLES Rafael

Fao-Copemed

 

X

X

SEDRATI

INRH, Maroc

 

X

 

SROUR Abdellah

INRH, Nador, Maroc

 

X

X

SOUPLET Arnaud

MEDITS, (IFREMER) France

 

X

X

SRAIRI Ali

INRH, Evaluation directe, Maroc

Medits Co-ordinator for Morroco

elouairi@inrh.org.ma

 

X

ZOUBI Abdelaziz

INRH, Biostatistiques, Maroc

 

 

X

 

___

 



[1] During these meetings, only technical and scientific items have been considered. It was anticipated that other aspects (particularly the financial ones) will be studied through Moroccan officials and Fao-Copemed relationships.

[2] As soon as the participation of the Moroccan team will be formally agreed by the Medits co-ordination committee, an access to the restricted area will be given to this team. By this way, this team will be able to catch the common software in use within the programme.